Tuesday 24th Nov 202624/11/2026
What circumstances would result in the North Cantilever being closed?
The North Cantilever may occasionally be closed to maintain the safe and efficient operation of the Tamar Bridge.
Closures may be necessary due to:
- Planned maintenance or inspection works.
- Breakdowns or stranded vehicles.
- Traffic collisions or emergency incidents.
- Abnormal load (AB-load) movements.
- Adverse weather conditions.
- Other operational requirements affecting the safe use of the cantilever.
When the North Cantilever is closed, a diversion route will be implemented to direct traffic onto the main bridge deck. Our aim is always to minimise disruption while maintaining a safe route for all users.
Tamar Bridge
Share this FAQ
Share on Twitter
Share on Facebook
Share on Linked In
Share by Email
https://www.tamarcrossings.org.uk/support/faqs/what-circumstances-would-result-in-the-north-cantilever-being-closed/Copy Link